ZEUS on the move: Wheels up to turn stranded gas reserves into sustainable energy sources
Four players – MISC, Petronas, Aker Solutions (AKSO), and Clean Energy Systems (CES) – have laid the groundwork for a demo front-end engineering and design (FEED) process to pave the way for the development of the Zero Emission Power Station (ZEUS) pro…