UK energy market regulator Ofgem has withdrawn the cap and floor regime awarded in principle for a 1.4 GW interconnector due to the project having encountered “significant delays”.
The post Ofgem withdraws cap and floor regime for 1.4 GW interconnector appeared first on Offshore Energy.