Oslo-listed oil and gas E&P player BW Energy has taken the final investment decision (FID) for a development in the Campos Basin field offshore Brazil. The project will encompass an integrated drilling and wellhead platform (WHP) and a refurbished floating production storage and offloading (FPSO) unit.
The post With Brazilian oil project approved, BW Energy sets sights on doubling output by 2028 appeared first on Offshore Energy.